News Agency
The Times

  • Written by PR Newswire

KAOHSIUNG, Oct. 6, 2026 /PRNewswire/ -- E&R Engineering Corp. (TPEX: 8027), a specialist in semiconductor laser and plasma processing equipment, will highlight its latest semiconductor laser processing breakthroughs at SEMI West 2026, focusing on high-precision laser drilling for Fiber Array Units (FAUs) and advanced packaging solutions.

Five-Axis FAU Laser Drilling with ±0.5 μm Accuracy

To meet growing demand for high-density optical components in high-speed optical communications and Co-Packaged Optics (CPO), E&R has developed a high-precision FAU laser processing solution. Development is focused on 2D FAU configurations supporting bandwidths of 3.2 Tbps, 6.4 Tbps, and 12.8 Tbps. Combining five-axis laser control, precision positioning, and micromachining, the solution achieves drilling accuracy of ±0.5 μm and supports various hole geometries and processing angles.

Comprehensive Laser & Plasma Solutions for Next-Gen AI & HPC Packaging

To address the stringent interconnect density and thermal budget challenges driven by AI and HPC architectures, E&R delivers an end-to-end processing portfolio for advanced 2.5D/3D ICs and high-density substrates. E&R's capabilities include high-precision laser drilling (achieving ±5 μm accuracy with a blind via B/T ratio up to 90%), high-throughput multi-beam laser marking (±25 μm accuracy), controlled thermal laser cutting, and lane-defined ABF grooving. By seamlessly integrating laser debonding into packaging workflows alongside high-stability plasma systems (CPK > 1.33) for surface cleaning and activation, E&R's process integration platform supports customers across the entire continuum—from initial R&D validation through full production-scale deployment.

Robust U.S. Service & Technical Support

Backed by local service teams across key U.S. hubs—including Portland, Arizona, and Texas—E&R ensures rapid response times, remote diagnostics, and tailored technical support. This regional presence minimizes downtime, optimizes yield, and accelerates time-to-market for North American semiconductor partners.

E&R at SEMI West 2026

  • Dates: October 13 – October 15, 2026
  • Venue: Moscone Center, San Francisco, California, USA
  • Booth: South Hall, Hall C, #2153
  • Website:https://en.enr.com.tw/

E&R Unveils Precision Laser Micromachining Platform for 2D FAU Arrays at SEMI West 2026E&R Unveils Precision Laser Micromachining Platform for 2D FAU Arrays at SEMI West 2026

 

Read more http://www.prnasia.com/story/archive/5064671_HK64671_0

How Does Temporary Fencing Help Simplify Project Planning?

Why Does Temporary Fencing Matter During Project Planning?  A controlled boundary is essential when construction, infrastructure maintenance, demolition,  landscaping, and other projects are underway. That is when temporary fencing becomes an important  option to consider. The fencing layout affects more than site... Read more

Writers Wanted



NewsServices.com

Content & Technology Connecting Global Audiences

More Information - Less Opinion